|
Search
You searched for the word(s):
Showing page 11 of 11 (110 total posts)
< 1 second(s)
-
Thanks Bob but both are PCM audio ?
-
Right I have created the exact same project in S9+ and I'm getting 51% quality, 3846 kbites for a 2hr 22mins dvd
In S11U its 33% quality, 2508 kbits for a 2hr 22mins dvd WHY THE DIFFERENCE and how can I get the same results as S9+. Thank you
-
Hi burning a 2hr 20mins DVD in S11U and the settings are Automatic 144mins at 2508kbits PCM audio. Now in studio 9+ I was able to burn a 2hr 46mins DVD in Custom at 3240kbits PCM audio . Why the difference I would have thought the shorter 2 Hr 20 DVD would would have had a better kbit rate than the longer DVD ? . Could someone please ...
-
Hi GingerMac on the wasted DVDs try burning to RWs that way you can test and reuse again,sorry I don't know the answer to the sound problem
-
Thanks Marcus still had problems but finally got there
-
Hi I'm trying to put smartsound on new computer with Win XP and S11U . I have read some threads and followed their instructions but I'm still having problems I download Smartsound patch but when I go into S11 and try SS it keeps asking for CD which CD? as I have S9 , S9+upgrade and now S11U. I even copied the sound files on old ...
-
I would like to thank EVERYONE in this forum for all their help and would like to WISH YOU ALL A MERRY CHRISTMAS
From Northern Ireland
-
Thank you for your comments The Editing program was none other than Studio 9 Plus.
Kept the lead singer on main Timeline and added the other members on OL track it was tricky trying to keep in sync and although its not perfect I got away with it
-
http://www.youtube.com/watch?v=yeH5pLE-L3o
Hi did this project over 2 years ago and if I say so myself quite proud of it as it was my first attempt at a pop video If I did it now I would change some things and the editing would be better but the whole project was done on 1 camera with 5 takes [ 1 take on each member and 1 take as general ...
-
Hi It was very good the only point I would pick up on is that in some scenes you would need to edit a bit quicker and cut out where the actors are standing still waiting to act and redo some scenes where the take needed redoing ie trying to open a doorbut was too long, but WELL DONE
... 11
|
|
|